A little further with the sled. Got it pre-wired for the generator and the 110 electrical plugs; for things like engine block heaters, battery charger and extra lighting when we want it. Squirted some paint on it yesterday.That flat area in front of the topper is an escape hatch. If the rear of the sled ever went through and blocked the door from opening.
Sally is about done as well. Need to finish the trailing axle suspension and she should be ready to go? May need to go to Nipissing to test it; considering Simcoe is still to sketchy for my liking; plus Sally's extra weight that she put on.
Dan.