Just noticed that there were 666 posts in this thread.
Gotta fix that post haste!!!
Was out at the cabin doing a little work today. The temps are getting up into the minus single digits and the sun is shining.
Took out some lumber and all the chimney pieces for my stove. Got the cement board installed but have to wait for above freezing temps to do the tiling of the hearth. Then I can get the stove all installed although it will need to be removed when I install the posts for the stair railings and the river rock veneer behind the stove. That's a couple of years out.
They sure don't give the chimney fixin's away. Stuff is uber spendy.
I've got $1,200 into this pile of chimney and duct work.
Oh well, at least I'll have heat.