Thanks guys, I’ve decided that buying new is risky for me right now with out potential pending economic doom ~$11k for motor and controls out the door for an Etec, more for a Suzuki.
I’m Sticking with used until the horizon looks better
65 granite steps up from the water, with flagstone landings every 10 steps, and 2 flagstone patio/sitting areas on the way down.
I got really tired of hills.
Laid the wet lay in November. Built the Tarp Mahal and heated it round the clock to cure the mortar. What a pain that was. I mean there is never any wind right on the water.🤥🤥
Thanks. It's my bosses place. I did all the hardscape. Alot of cutting. I cut all the armour stone so that I had tight 1.5 inch joints to grout. As well as cutting all the flag, other than the square cut.
He was a little irritated that I like to use a line and level to shoot my grades i stead of a laser lol.